UPDATE: Data Access Issue: ASL Zooplankton Acoustic Profiler (ZAP) Data...
There is an issue with all our ASL Zooplankton Acoustic Profiler (ZAP) data products. We are working to resolve the problem, but right now all the data products available from the VENUS Download Data...
View ArticleFIXED: Data Access Issue: All data requests from VENUS Download Data are...
All data requests from VENUS Download Data are failing and our Data Plots aren’t updating. The ONC Systems team is currently investigating the problem. We hope to have the issue resolved as soon as...
View ArticleONC Data Request Failures and Login Issues
2013-Nov-07: UVic Systems’ MATLAB license server went down yesterday evening so many data requests from the ONC data access interfaces (Oceans 2.0 Data Search and VENUS Download Data) failed. The...
View ArticleUPDATED Feb 17, 2014: OUTAGE: The SOG Array is down due to a power outage at...
UPDATE: The SOG Shore station power was restored late afternoon on Feb 14, 2014. All systems are up and going. Due to a power outage at IONA, all cabled SOG systems are down including SOG-Central VIP,...
View ArticleDI Software Release and Driver Update on February 18, 2014
A regular update of our Oceans 2.0 software suite is scheduled on the morning of Feb 18, 2014. Brief interruptions of software services are possible. Data collection will have a brief outage (~20...
View ArticleUPDATED: SOG Array down
Due to communication loss at the IONA wastewater station, the Strait of Georgia array is down. Engineers are looking into the cause and will provide updates when more information is available. UPDATE:...
View ArticleStrait of Georgia Arrays down on June 11, 2014 due to issues at the IONA...
All Strait of Georgia arrays had to be taken offline due to air conditioning issues that the IONA Shore Station. Engineers are presently working to solve the issue and will bring the array back on line...
View ArticleSept 4: Data delayed by ~6 hours
Data are delayed by approximately 6 hours. Data are buffered, so we are expecting no loss of data. Thank you for your patience.
View ArticleONC VENUS Maintenance Cruise September 16-23, 2014
The ONC VENUS engineering team will be at sea between September 16-23, 2014 conducting maintenance on instrument systems in Saanich Inlet and Strait of Georgia. During this time, Data Plots might not...
View ArticleUPDATE – SOG Array is back up and running!
All Strait of Georgia subsea infrastructure is presently down – November 13, 2014 ONC engineers have lost communications with the Strait of Georgia shore station resulting in all the subsea equipment...
View Article
More Pages to Explore .....